Our journey with the Lodge began in January 2020, when our offer was accepted. Because of its severely deteriorated condition, the sale took six months to complete—and even then, we still hadn’t stepped inside. The building had been declared too dangerous to enter.

When we finally walked through the doors, the scale of the challenge became clear. The front room floor had completely collapsed. The porch was barely attached, with a gaping hole above it where daylight—and even a small tree—pushed through. All of the structural timbers were rotten, the roof was failing, and the pillars in the side bay window had given way.

But none of this discouraged us. With Chris’s 25 years of experience running his own construction company, he was eager to begin the transformation. Progress was delayed by nearly ten months due to planning approvals, but at last, work began in the spring of 2021.

From the outset, our mission was to restore the Lodge with respect for its history. We salvaged and reused everything we could—from slipped roof tiles to the scattered original bricks.

A skilled stonemason rebuilt the collapsed pillars to mirror those on the front bay window, and Chris’s dad spent an entire month carefully cleaning the stonework by hand. His dedication brought the magnificent Crest of Nottingham above the door back to life.

Chris worked tirelessly—seven days a week for an entire year—to bring the Lodge back to its former glory in time for our opening in September 2022.

The transformation didn’t end with the building. What was once a steep, muddy bank has been redesigned into two beautiful garden spaces, tailored to different age groups, complete with a vegetable patch and an outdoor dining area.